While ORIANA's refit took many months of planning from its initial announcement in late 2010/early 2011 to the refits start in November 2011 it is interesting to compare the stages it went through before the final plans were completed below the exemplified by the forward end of the Lido deck namely the Oasis Spa
In the deck plans for ORIANA during early 2011 it showed the only major alteration on the deck being to Alfresco's being replaced by the new Sorrento restaurant and the room being enlarged and taking out to the glass screening of the starboard side.
While eventully the plan was dropped Sorrento becoming a feature on the aft lido deck the Alfresco's instead remains at the same size with only a change of theme.
Of more interest is the Spa its self as shown originally to have no alterations made in the finished refit the Gymnasium has more than doubled inside taking up much of the space formally occupied by the spa itself.
Below we have a decks plans showing a before, after and early refit layout for the spa area
"As with her cherished namesake and her sister the sacred CANBERRA, old acquaintance will be more than enough to ensure that whenever the great ships of Britain are brought to mind, another ORIANA shall now never be forgot."
segunda-feira, 30 de janeiro de 2012
A comparison- ORIANA's spa area
Subscrever:
Enviar feedback (Atom)
Sem comentários:
Enviar um comentário